- Aeroexpress >
- Press >
- The Aeroexpress is ready for winter: 18 trains, 33 buses, and 4 terminals have undergone scheduled seasonal maintenance
The Aeroexpress is ready for winter: 18 trains, 33 buses, and 4 terminals have undergone scheduled seasonal maintenance
Nov 24, 2026
Aeroexpress has prepared its trains, express buses, terminals, and staff for operation during the winter period. This will make trips to the capital’s airports, Sheremetyevo and Domodedovo, as safe and comfortable as possible during the cold season.
The company’s specialists, based at its own repair depot, carried out seasonal preparation of 11 double‑decker and 7 single‑decker trains: they checked the roof, undercarriage, and interior equipment. Special attention was paid to the pantographs. A special anti‑icing lubricant was applied to them so that snow and ice would not stick to the pantographs, allowing them to operate normally during heavy snowfalls, ice, and freezing rain. If necessary, the special compound is renewed during each train maintenance. In addition, the pantographs were switched to winter mode to maintain continuous electrical contact in cold weather and heavy precipitation.
An additional check of the train braking system and the proper functioning of the sand supply system for effective braking and adhesion of the wheelsets to the rails was also carried out; the parts of the undercarriage were treated with anti‑icing agents. To protect the traction electric motors and converters from snow and ice, special protective caps were installed.
“Aeroexpress is 100 % ready for operation during the winter period. We have completed the comprehensive preparation of the entire transport infrastructure: trains, express buses, passenger terminals, and staff.” It is fundamentally important for us that, regardless of the weather conditions, passengers can count on reliable, safe, and comfortable communication with the capital’s airports. Annual winter preparation is not just routine technical measures, but an important part of our systematic work to ensure a high quality of transportation. All necessary measures have been taken, and we are ready to work in conditions of low temperatures, snowfall, and other seasonal weather phenomena,” said Andrey Akimov, General Director of Aeroexpress.
In addition, the company has completed mandatory seasonal briefings with all locomotive crews and express bus drivers; 240 people took part in them.
During the briefings, train drivers, their assistants, and express bus drivers, together with specialized Aeroexpress staff, traditionally reviewed various situations on the railway and road, reviewed the rules for boarding and disembarking passengers, crossing road intersections, and actions in emergency situations. Special attention was paid to professional skills — all operators and drivers know how to properly operate vehicles in conditions of limited visibility, sudden temperature changes, ice, and snowfall. To ensure a comfortable stay for passengers in all terminals during the winter period, Aeroexpress employees checked the operation of heating and ventilation systems, the availability of inventory and equipment for maintaining external structures, and inspected the readiness of cleaning services.
33 express buses of the company also underwent a technical inspection. As part of the seasonal maintenance, all onboard systems responsible for the uninterrupted operation of the vehicle were diagnosed; the brake system, steering system, and chassis of the buses were inspected. In addition, the specialists checked the climate control equipment in the bus cabins and the engine cooling systems, door seals, windows and hatches, and door mechanisms.